SEA HARRIERTHE SIMULATOR PROJECT
DEVELOPMENT

FOLLOW THE
BUILD.

The development record for the Sea Harrier Simulator, beginning with the software and expanding as each physical stage of the project begins.

CURRENT / MONTHS 0–12

Simulation Software

Aircraft physics, commands, HUD, radar, carrier environment and the software architecture that will eventually connect to the physical cockpit.

MONTHS 0–12

Martin-Baker 10H

Research, modelling and construction of the full-scale seat and establishment of the pilot position.

MONTHS 12–24

Cockpit Structure

Measurements, geometry, prototype construction and development of the full-size cockpit structure.

MONTHS 12–24

Controls & Instrumentation

Flying controls, switches, instruments, electronics and their integration with the simulation software.

MONTHS 24–30

Visual & Motion Systems

Development and integration of the visual environment and six-axis motion system.

FINAL INTEGRATION

Testing & Integration

Bringing the software, cockpit, electronics, controls, visual environment, sound and motion together.